...
首页> 外文期刊>Journal of Petroleum Technology >Moorings Replacement and Hook-up for a'Damaged North Sea FPSO
【24h】

Moorings Replacement and Hook-up for a'Damaged North Sea FPSO

机译:损坏的北海FPSO的系泊设备更换和连接

获取原文
获取原文并翻译 | 示例

摘要

In a North Sea storm during February 2011, the Gryphon Alpha floating production, storage, and offloading (FPSO) unit broke four of its 10 mooring lines and moved partially off station, resulting in damage to subsea assets. Following the incident, the FPSO was taken to dry dock for replacement of the damaged subsea infrastructure and moorings. This paper describes the measures put in place so that the mooring system could be replaced and the FPSO reconnected on an efficient schedule.
机译:在2011年2月的北海风暴中,狮ry Alpha的浮动生产,存储和卸载(FPSO)装置中断了其10条系泊缆线中的4条,并部分移出了站台,导致海底资产受损。事故发生后,FPSO被带到干船坞以更换受损的海底基础设施和系泊设备。本文介绍了已采取的措施,以便可以有效地更换系泊系统并重新连接FPSO。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号