...
首页> 外文期刊>Coal Age >PACIFICORP'S DAVE JOHNSTON MINE PLANTS A WIND FARM
【24h】

PACIFICORP'S DAVE JOHNSTON MINE PLANTS A WIND FARM

机译:PACIFICORP的戴夫·约翰逊矿场种下了风电场

获取原文
获取原文并翻译 | 示例
           

摘要

In what many are calling an industry-wide first for post-mine land development, PacifiCorp's subsidiary Rocky Mountain Power this summer announced plans to begin permitting a 99 megawatt (mw) wind farm on their closed Dave lohnston surface mine located about 12 miles north of Glenrock, Wyo. This planned wind generating facility, located on 200 acres out of 4,800 acres of reclaimed mine land, is the first of its kind in Wyoming, and perhaps the first wind farm to be sited on former mine lands anywhere in the U.S. More than 30 years after the passage of the Surface Mining Control and Reclamation Act in 1977-despite what several environmental groups are purporting- tremendous acreage of disturbed lands are within final reclamation stages, and thousands of acres are close. The proposed wind power facility will consist of 66 GE 1.5-mw wind turbines. The towers will be 80 meters high with 77-meter diameter blades. Most of the new power lines associated with the facility will be located underground. Given the relatively small footprint of the wind farm, the vast majority of land at the Dave Johnston mine will remain open for grazing and wildlife habitat purposes.
机译:PacifiCorp的子公司Rocky Mountain Power今年夏天宣布了一项计划,开始在其位于北面约12英里的Dave lohnston露天矿上允许一个99兆瓦(mw)的风力发电场。怀俄明州的Glenrock这座计划中的风力发电设施位于4800英亩的填海矿区中,占地200英亩,是怀俄明州的首个此类风电场,也许是第一个位于美国任何地方的原矿区的风电场。尽管1977年《露天采矿控制和垦殖法案》通过了30年,但尽管有几个环境团体声称,但受干扰的土地面积仍在最后的垦殖阶段,成千上万英亩土地却被关闭。拟议的风力发电设施将包括66台GE 1.5兆瓦的风力涡轮机。塔身高80米,叶片直径为77米。与该设施相关的大多数新电源线将位于地下。由于风电场的占地面积相对较小,Dave Johnston矿场的绝大部分土地仍将开放供放牧和野生动植物栖息地使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号