...
首页> 外文期刊>World Steel Capacity News >India’s Tata Steel to commiss ion new Kalinganagar plant by December
【24h】

India’s Tata Steel to commiss ion new Kalinganagar plant by December

机译:印度塔塔钢铁公司计划在12月之前投产Kalinganagar新工厂

获取原文
获取原文并翻译 | 示例

摘要

By December India’s Tata Steel is planning to commission a new 3 million tpy Kalinganagar plant inOdisha state, the local sources report.The construction works of the Phase I have been completed. The scope of equipment includes a5.75 million tpy sinter plant, a 1.8 million tpy coking plant, a 3.2 million tpy BF, a 3 million tpy BOF-basedmeltshop and a 3 million tpy hot strip mill. About INR 220 billion (about $3.45 billion) was drawn out ofINR 250 billion (about $3.92 billion) estimated for the phase implementation.
机译:据当地消息人士称,印度塔塔钢铁公司计划在12月之前在奥里萨邦新建一座年产300万吨的Kalinganagar工厂。一期工程已经完成。设备范围包括一个575万吨/年的烧结厂,180万吨/年的焦化厂,320万吨/年的高炉,300万吨/年的转炉熔炼车间和300万吨/年的热轧机。在为该阶段实施估算的2500亿印度卢比(约39.2亿美元)中,提取了约2200亿印度卢比(约34.5亿美元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号