...
首页> 外文期刊>Disasters: The International Journal of Disaster Studies and Practice >Strategic planning for post-disaster temporary housing.
【24h】

Strategic planning for post-disaster temporary housing.

机译:灾后临时住房的战略规划。

获取原文
获取原文并翻译 | 示例
           

摘要

Temporary housing programmes suffer from excessively high cost, late delivery, poor location, improper unit designs and other inherent issues. These issues can be attributed in part to a prevalence of ad hoc tactical planning, rather than pre-disaster strategic planning, for reconstruction undertaken by governments and non-governmental organisations (NGOs) in the chaotic post-disaster environment. An analysis of the process and outcomes from six case studies of temporary housing programmes after disasters in Turkey and Colombia in 1999, Japan in 1995, Greece in 1986, Mexico in 1985, and Italy in 1976 yields information about the extent to which strategic planning is employed in temporary housing programmes, as well as common issues in temporary housing. Based on an understanding of these common issues, this paper proposes a framework for strategic planning for temporary housing that identifies organisational designs and available resources for temporary housing before the disaster, but allows modifications to fit the specific post-disaster situation.
机译:临时住房计划存在成本过高,交付延迟,位置差,单元设计不当以及其他固有问题。这些问题可以部分归因于在混乱的灾后环境中由政府和非政府组织(NGO)进行重建的临时战术规划,而不是灾前战略规划。通过对土耳其和哥伦比亚在1999年,日本在1995年,希腊在1986年,墨西哥在1985年,意大利在1976年发生灾难后的六个临时住房计划的案例研究的过程和结果进行分析,可以得出有关战略规划的程度的信息。受雇于临时住房计划,以及临时住房中的常见问题。基于对这些常见问题的理解,本文提出了临时住房战略规划的框架,该框架确定了灾难发生前的临时住房的组织设计和可用资源,但可以进行修改以适应特定的灾后情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号