...
首页> 外文期刊>Zeus syngas refining report >Viridor's amended plans for WTE plant in Fengate approved
【24h】

Viridor's amended plans for WTE plant in Fengate approved

机译:Viridor的丰特WTE工厂修订计划获得批准

获取原文
获取原文并翻译 | 示例
           

摘要

Peterborough and City Council's Planning and Environmental Protect Committee have approved Yjridor's amendments to a plan for a waste-to-energy plant at Fourth Drove, Fengate, United Kingdom, The facility will be located at the integrated Resource Recovery Park on Fengate Industrial Estate. The original plan proposed by Viridor in 2010 called for a 65,000 tonne per year waste to energy facility. Viridor, a part of the Pennon Group, now plans to build a facility with a waste processing capacity of 85,000 tonnes per year. Further, the amended facility will have a 40 percent smaller footprint than the originally consented plant.
机译:彼得伯勒(Peterborough)和市议会的规划与环境保护委员会已经批准了耶德勒(Jjridor)对位于英国丰特(Fengate)的Four Drove的垃圾发电工厂计划的修正案,该工厂将设在丰特工业园区的综合资源回收园。 Viridor在2010年提出的原始计划要求将每年65,000吨的废物转化为能源设施。 Penrid集团的一部分,Viridor现在计划建造一座年处理85,000吨废物的设施。此外,经过修改的工厂的占地面积将比最初同意的工厂小40%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号