首页> 外文期刊>Zeus liquefied natural gas report >Germany to Pipe Additional Gas to Poland
【24h】

Germany to Pipe Additional Gas to Poland

机译:德国将向波兰输送更多天然气

获取原文
获取原文并翻译 | 示例
           

摘要

Poland's pipeline operator Gaz-System announced Oct. 7 that it has signed contracts to allow 27 companies access to import capacity from the country's interconnector with Germany-Capacity of the Lasow interconnector will be expanded to approximately 1.5-billion cubic meters a year (bcm/y) from approximately 0.5 bcm/y as of January 2012. The extra supply will be used to feed the country's existing natural-gas transmission system and spur the development of new transmission lines. By 2014, the company will construct over 1,000 km (621 miles) of new pipelines.
机译:波兰的管道运营商Gaz-System于10月7日宣布,已签署合同,允许27家公司从德国与德国的互连器获得进口能力。Lasow互连器的产能将扩大到每年约15亿立方米(bcm / y)从2012年1月起大约为0.5 bcm / y。多余的供应将用于养活该国现有的天然气传输系统,并刺激新传输线的发展。到2014年,该公司将建设超过1,000公里(621英里)的新管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号