...
首页> 外文期刊>Daily Oil Bulletin >New Crude Oil Pipeline Projects Will Ease Constraints, Says NEB
【24h】

New Crude Oil Pipeline Projects Will Ease Constraints, Says NEB

机译:NEB表示,新的原油管道项目将缓解限制

获取原文
获取原文并翻译 | 示例

摘要

After periods of apportionment on Canadian crude oil export pipelines, new projects currently under construction are expected tc ease any capacity constraints as early as this fall, says the National Energy Board. "We've seen capacity constraints on oil pipelines for the past several years," Gaetan Caron, NEB chairman, said in a prepared statement as the board released its fifth annual Canadian pipeline transportation system-transportation assessment. "This will chang toward the end of 2009 and into 2010 when pipelines previously approved by the board begin operations."
机译:国家能源局表示,经过对加拿大原油出口管道的分摊期后,目前正在建设中的新项目有望最早在今年秋天缓解任何产能限制。 NEB董事长盖恩·卡隆(Gaetan Caron)在一份准备好的声明中说:“过去几年,我们已经看到石油管道的运力限制。”该委员会发布了第五次年度加拿大管道运输系统运输评估。 “这将在2009年底和2010年改变,届时董事会先前批准的管道将开始运营。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号