首页> 外文期刊>WSEAS Transactions on Business and Economics >Measuring Financial and Business Operation Impacts, of Software Project Initiatives and Investments, using Project Tracking MarkPoints on the Project Volume
【24h】

Measuring Financial and Business Operation Impacts, of Software Project Initiatives and Investments, using Project Tracking MarkPoints on the Project Volume

机译:使用项目量上的项目跟踪MarkPoint来测量软件项目计划和投资的财务和业务运营影响

获取原文
获取原文并翻译 | 示例
       

摘要

Measuring the size of a project has always been a challenge in all the disciplines involved in project management. In software project management, defining a measurement unit for a project is even more difficult since the unique characteristics of the software make it invisible and untouchable, and therefore much more difficult to be measured. This paper presents a model that can contribute towards this issue. The MarkPoint presented can be considered as a sizing and measurement unit to a software project. The MarkPoints are based on the requirements of a project where their initial weighted distribution per requirement, implementation phase and other project elements makes the project size needed for the management of the project. The paper initially states the need for such models in the business world and defines the excepted environment for them to be applied successfully. The model and the overall concept is approach from a business and financial perspective, since it's a business oriented approach driven by business needs and expectations in managing software project and investments.
机译:在项目管理涉及的所有学科中,衡量项目的规模一直是一个挑战。在软件项目管理中,为项目定义度量单位更加困难,因为软件的独特特性使其不可见和不可触碰,因此度量起来就困难得多。本文提出了可以对此问题做出贡献的模型。所提供的MarkPoint可以视为软件项目的大小和度量单位。 MarkPoints基于项目的需求,在这些需求中,每个需求,实施阶段和其他项目要素的初始加权分配使项目规模成为项目管理所需的规模。本文最初陈述了在商业世界中对此类模型的需求,并定义了成功应用它们的例外环境。该模型和总体概念是从业务和财务角度出发的方法,因为它是一种由业务需求和对软件项目和投资进行管理的期望所驱动的面向业务的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号