Project Tracking using a Metrics Binder Analysis (MBA) Model on Software Project Initiatives (SPI)

机译:使用基于软件项目计划(SPI)的指标活页夹分析(MBA)模型进行项目跟踪

获取原文
获取原文并翻译 | 示例
       

摘要

Project management and software project management in particular is about managing the implementation effort required towards the completion of a project in time, budget and quality. The management effort is based heavily on project tracking techniques and practices were the project implementation progress is closely monitored and analyzed. This paper presents a project tracking model based primarily on the project requirements and its implementation evolution through the project lifecycle. The tracking process is supported by a set of metrics which cumulatively collaborate, since day one of the project implementation, towards the interpretation of the real project progress via various measurements and results continuously. This live project tracking system is a metric binder analysis for software projects and initiatives, were more than 30 metrics are bind together, creating an accurate, practical and realistic picture of the project progress for the entire project or for any of its components, all the way down to its requirements.
机译:项目管理和软件项目管理尤其是关于在时间,预算和质量上管理完成项目所需的实施工作。在对项目实施进度进行密切监视和分析时,管理工作很大程度上基于项目跟踪技术和实践。本文提出了一个项目跟踪模型,该模型主要基于项目需求及其在项目生命周期中的实现演变。跟踪过程由一组度量标准支持,这些度量标准从项目实施的第一天开始就通过各种度量和结果不断地协作以解释实际项目的进度。该实时项目跟踪系统是针对软件项目和计划的指标绑定分析,将30多个指标绑定在一起,可为整个项目或其任何组件,所有项目创建准确,实用和现实的项目进度图降至其要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号