首页> 外文期刊>Hart's E&P >Precision stimulation delivers results
【24h】

Precision stimulation delivers results

机译:精准刺激带来成果

获取原文
获取原文并翻译 | 示例
           

摘要

A well planned and executed well stimulation is one of the primary methods to enhance production from both oil and gas reservoirs and increase injectivity to injection and disposal wells. Some key components for optimal stimulation treatments are the chemicals or treatment fluids themselves, the length and location of interval(s) that require stimulation and also the deployment or diversion method to be used. With the economics of some treatment fluids in the industry today more of an emphasis is being put on accurate placement of these fluids. This is highlighted more in marginal fields that may have a low reservoir pressure. When stimulating these wells with coiled tubing (CT) as the deployment method, control of the treatment fluid is paramount. In a high percentage of these low reservoir pressure wells a high overbalance in favor of the CT may exist, leading to fluid fall out of the coil at an uncontrolled rate.
机译:井井有计划,井井有条的增产措施是提高油气藏产量和增加注入井和处置井注入量的主要方法之一。最佳刺激治疗的一些关键组成部分是化学物质或治疗液本身,需要刺激的间隔的长度和位置以及要使用的展开或转移方法。随着当今工业中某些处理液的经济性,人们将更多的重点放在这些液的准确放置上。这在可能具有低储层压力的边缘油田中更加突出。当使用连续油管(CT)作为部署方法刺激这些井时,控制处理液至关重要。在这些低油藏压力井中,有很大比例的井可能存在有利于CT的高过平衡状态,导致流体以不受控制的速率从盘管中掉出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号