首页> 外文期刊>Wuhan University Journal of Natural Sciences >Criterions and Measures of Route Selection of Shallowly Embedded Long-Distance Oil and Gas Pipeline in Mountain Areas
【24h】

Criterions and Measures of Route Selection of Shallowly Embedded Long-Distance Oil and Gas Pipeline in Mountain Areas

机译:山区浅埋长距离油气管道选线的标准和措施

获取原文
获取原文并翻译 | 示例
       

摘要

According to the engineering investigation of long-distance oil and gas pipelines, the criterions and measures of route selection are drawn as follows: the flat landform is the first choice in route alignment. The foot of mountain is the first choicewhen the route passes by the valley. The route should pass by but the shady and deposited slope and not in sunny and erosive slope as possible as it can. The pipeline should be vertical to contour climbing and descending the mountain except steep slope.Tunnel can be used in crossing foothill. Perpendicularly traversing the river is better than beveling; the worst choice is to put the pipeline a-long the river. Bypass is the best choice in karsts area. The order of route selection should be pre-choosing, investigation, optimization and adjustment.
机译:根据对长输油气管道的工程研究,得出了选线的标准和措施如下:平坦的地形是选线的首选。当路线经过山谷时,山脚是第一选择。路线应通过但应避开阴暗的坡度,而不应尽可能在阳光充足且侵蚀的坡度上通过。除陡坡外,管道应垂直于轮廓线攀登和下降。隧道可用于穿越山麓。垂直穿越河流胜于倒角。最糟糕的选择是将管道沿河流延伸。绕行是喀斯特地区的最佳选择。路线选择的顺序应该是预先选择,调查,优化和调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号