首页> 外文学位 >Development of a risk measure as a project selection criterion for sustainable development.
【24h】

Development of a risk measure as a project selection criterion for sustainable development.

机译:制定风险度量作为可持续发展的项目选择标准。

获取原文
获取原文并翻译 | 示例

摘要

Risk is a relevant criteria to consider in a multi-criteria analysis of sustainable development projects. An original algorithm is developed for the derivation of a risk measure based on the perception of risk as expressed by the participants. The application of the developed algorithm is tested using the Manitoba Hydro North Central Project as a case study.; The one unique aspect of the risk measure is its use of participant weights to express the magnitude of the risk. Using the input from the affected participants enhances the assessment process. The joint risk estimate can be used to conduct a sensitivity analysis and determine where an acceptable level of risk lies in terms of societal priorities. Considering the risk of missing the positive benefits of a project as well as negative consequences broadens the meaning of the risk measure. Examining the positive and negative effects of projects allows the trade-offs offered by the alternatives to be analysed.; The risk measure provides decision makers with additional information. The sensitivity analysis of the joint risk estimates and the presentation of these illustrate the agreement or disagreement between the participants. The risk measure offers a standardised framework for the assessment of projects based on risk.; It is recommended that fuzzy logic be used to aid in the estimation of risk magnitudes to be used with the presented algorithm. In a multi-criteria analysis the independence of criteria is required. Therefore a risk criterion should be carefully incorporated in the decision making process. (Abstract shortened by UMI.)
机译:风险是对可持续发展项目进行多标准分析时要考虑的相关标准。开发了一种原始算法,用于根据参与者表达的风险感知来推导风险度量。以曼尼托巴水电北中央项目为例,对开发的算法的应用进行了测试。风险衡量的一个独特方面是它使用参与者权重来表示风险的大小。使用受影响的参与者的输入可以增强评估过程。联合风险评估可用于进行敏感性分析,并确定在社会优先级方面可接受的风险水平。考虑错过项目的正收益和负面后果的风险,扩大了风险衡量的含义。检查项目的正面和负面影响,可以分析替代方案提供的折衷。风险度量为决策者提供了更多信息。联合风险评估的敏感性分析以及这些评估的呈现方式说明了参与者之间的同意或不同意。风险度量为基于风险的项目评估提供了标准化的框架。建议使用模糊逻辑来辅助估计与提出的算法一起使用的风险大小。在多准则分析中,准则的独立性是必需的。因此,在决策过程中应仔细考虑风险标准。 (摘要由UMI缩短。)

著录项

  • 作者

    Kroeger, Heidelore Irene.;

  • 作者单位

    The University of Manitoba (Canada).;

  • 授予单位 The University of Manitoba (Canada).;
  • 学科 Engineering Civil.; Environmental Sciences.
  • 学位 M.Sc.
  • 年度 1997
  • 页码 119 p.
  • 总页数 119
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;环境科学基础理论;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号