【24h】

Alberta approves bitumen pipeline.

机译:艾伯塔省批准沥青管道。

获取原文
获取原文并翻译 | 示例
           

摘要

The Canadian province's Energy Resources Conservation Board has approved construction of a 200K-b/d blended bitumen line and 70K-b/d diluent line, both to transport product from Laricina Energy Ltd.'s thermal pilot project in Saleski to an up-and-coming pipeline hub in Cheecham. Laricina will also construct a tank farm near its Saleski project. The bitumen blend line is expected to come online in the second half of 2015, alongside the startup of first-phase commercial production at Saleski, while the diluent line will not enter service until 2016. Laricina may also construct an extension to the line in order to enable delivery to its Germain thermal project, where first-phase production startup has been scheduled for late 2013.
机译:加拿大省能源资源保护委员会已批准建设一条200K-b / d的混合沥青生产线和70K-b / d的稀释剂生产线,用于将Laricina Energy Ltd.在Saleski的热力试验项目中的产品运输到上层和下层。奇汉姆即将到来的管道枢纽。 Laricina还将在其Saleski项目附近建造一个油库。沥青混合料生产线预计将于2015年下半年上线,同时在Saleski进行第一阶段的商业化生产,而稀释剂生产线要到2016年才能投入使用。Laricina可能还会对该生产线进行扩建以便将其交付给Germain热能项目,该项目的第一阶段生产启动计划于2013年底进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号