首页> 外文期刊>World Gas Intelligence >Canada LNG Ailments at Infectious Stage
【24h】

Canada LNG Ailments at Infectious Stage

机译:加拿大LNG疾病处于传染阶段

获取原文
获取原文并翻译 | 示例
       

摘要

The paralysis afflicting Canada's planned West Coast LNG industry is spreading both up- and downstream. The National Energy Board has just agreed to extend the deadline for Nova Gas Transmission to start building a new gas pipeline in northeastern British Columbia because Malaysian state Petronas' proposed Pacific NorthWest LNG project remains at a standstill. The deadline has been pushed back a year to June 2017. Nova's North Montney pipeline is intended to tie into the proposed Prince Rupert Gas Transmission Pipeline, planned to ship gas to Pacific NorthWest. Petronas is still awaiting the final go-ahead for the LNG project from Ottawa, to be based on a report from the Canadian Environmental Assessment Agency, and Nova said it could not start work until the Malaysian state giant decides whether to proceed.
机译:困扰加拿大计划中的西海岸液化天然气行业的瘫痪现象正在上下游蔓延。国家能源委员会刚刚同意延长Nova Gas Transmission在不列颠哥伦比亚省东北部开始建设新天然气管道的期限,因为马来西亚国家石油公司提议的Pacific NorthWest LNG项目仍处于停顿状态。截止日期已推迟一年至2017年6月。Nova的North Montney管道旨在与拟议中的鲁珀特亲王天然气输气管道相结合,该管道计划将天然气运往西北太平洋。国油仍在等待渥太华液化天然气项目的最后批准,以加拿大环境评估署的报告为依据。诺瓦表示,直到马来西亚国有巨头决定是否进行之前,它才能开始工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号