DESIGN ASPECTS OF POWER HOUSE - MACHINE HALL

机译:电站机房的设计方案

获取原文
获取原文并翻译 | 示例
           

摘要

Power House and its appurtenant works comprise of complex underground openings in the form of two main caverns i.e., machine hall Cavern (222 m x 20 m x 49 m) (Photo 1)and transformer hall cavern (196 m x 18 m x 27.50 m) along with number of tunnels and construction adits. These two underground halls are interconnected by means of an elevator shaft and also six number D-shaped Bus-Duct galleries connect the turbine floor of machine hall with transformer hall . A view of components d/s of Surge shaftis showing Fig.1. Sectional view of Machine Hall is shown in Fig.2.
机译:动力房及其附属工程包括两个主要洞穴形式的复杂地下开口,即机器大厅洞穴(222 mx 20 mx 49 m)(照片1)和变压器大厅洞穴(196 mx 18 mx 27.50 m)以及数量隧道和建筑平巷。这两个地下大厅通过电梯井相互连接,并且六个数字D形母线槽画廊将机器大厅的涡轮机层与变压器大厅相连。喘振轴的部件d / s的视图如图1所示。机房的剖面图如图2所示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号