...
首页> 外文期刊>Water and Energy International >DESIGN ASPECTS OF AUXILIARY EQUIPMENTS OF POWER HOUSE OF ISP
【24h】

DESIGN ASPECTS OF AUXILIARY EQUIPMENTS OF POWER HOUSE OF ISP

机译:ISP厂房辅助设备设计方面

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The global tenders were invited for procurement of hydro generator equipment along with auxiliaries for 8 units of 125 MW sets for Indira Sagar project. The design, features of the equipment were competitive, conforming to latest world standards. Thisarticle describes the features of the generating equipment generally describing the design aspects of the various components of turbine like draft tube, spiral casing, guide mechanism, turbine shaft, sealing system, bearings, collar shaft etc. and generator components like stator, rotor, stator frame, rotor hub, spider, poles, bearings etc. This article also covers generally the control, supervision and monitoring philosophy. The selection of the equipment was carefully done as even after the lapse of12 years of drafting the specification, these are comparable with the current practices.
机译:邀请全球招标为Indira Sagar项目购买8台125兆瓦机组的水力发电机设备以及辅助设备。设备的设计,功能具有竞争力,符合最新的世界标准。本文介绍了发电设备的功能,通常描述了涡轮机各种组件(如引流管,螺旋套管,导向机构,涡轮机轴,密封系统,轴承,轴环等)以及发电机组件(如定子,转子,定子)的设计方面机架,转子轮毂,星形轮,极,轴承等。本文还概述了控制,监督和监视的原理。设备的选择是经过仔细的选择,因为即使在起草规格书的12年之后,这些也可以与当前的实践相提并论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号