CONSTRUCTION OF RCC DAMS: DELIVERY SYSTEMS

机译:RCC DAMS的构建:交付系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The emphasis of this paper is construction of RCC dams as part of hydro power plant or multipurpose projects and it discusses methodologies and plant and equipment for delivery of RCC.While existing construction technologies provide for selection of several efficient and reliable methodologies capable of meeting practically all requirements, different methodologies produce different results making selection of most suitable construction methodology as important as project's design. Since there is not one single, perfect solution, and that all available methodologies have number of pros and cons, our goal is selecting one with most pros and least cons.Very often, hopes of easier overcoming known problems and/or mistakes experienced in the past prevail over new, unfamiliar solutions. While repetition does guarantee selection process to be easier and quicker, it doesn't guarantee the repetition of results. If the goal is building a better quality project at lower cost, selecting the most suitable methodology i.e. plant and equipment is the only right way to achieve it.
机译:本文的重点是作为水力发电厂或多用途项目一部分的RCC大坝的建设,并讨论了交付RCC的方法,工厂和设备。虽然现有的施工技术为人们提供了几种能够切实满足所有要求的有效且可靠的方法根据要求,不同的方法会产生不同的结果,因此选择最合适的施工方法与项目设计同样重要。由于没有一个单一的,完美的解决方案,并且所有可用的方法都有很多利弊,因此我们的目标是选择一个优点最多,缺点最少的方法。很多时候,人们希望能够更轻松地克服已知问题和/或错误。过去战胜了陌生的新解决方案。虽然重复的确能确保选择过程更加轻松快捷,但不能保证结果的重复。如果目标是以较低的成本建设质量更高的项目,则选择最合适的方法(即工厂和设备)是实现此目标的唯一正确方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号