首页> 外文期刊>The HKIE Transactions >A theoretical study of the load deformation characteristics of a soil nail during performance tests based on elastic theories
【24h】

A theoretical study of the load deformation characteristics of a soil nail during performance tests based on elastic theories

机译:基于弹性理论的土钉性能试验荷载变形特性的理论研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In most soil-nailed slope works, there are normally two basic types of tests [BSI. BS EN 14490:2010. Execution of special geotechnical works - soil nailing; 2010]: sacrificial nail tests and production nail tests. In Hong Kong, Geoguide 7 [GEO. Guide to soil nail design and construction (Geoguide 7). Hong Kong: Geotechnical Engineering Office, Civil Engineering and Development Department; 2008] has only a pullout test, which is a sacrificial test to verify the design assumptions. Alternatively, Architectural Services Department (ArchSD) requires all soil nail works to carry out performance tests (i.e. production nail tests) after their construction, in addition to pullout tests. In existing ArchSD soil nail works, the acceptance criteria for soil nail head movement in performance tests is based on that in pullout tests. Nevertheless, the theoretical basis for this is not too strong. On the other hand, the BSI [BS EN 14490: 2010. Execution of special geotechnical works - soil nailing; 2010] acceptance criterion also cannot be applied as their soil nails have a de-bonded zone, not fully bonded. Accordingly, it is the purpose of the present paper to carry out a theoretical study of the load deformation characteristics of a soil nail during performance tests based on elastic theories in order to establish a more rational acceptance criterion. Based on present theoretical analyses, together with load deformation data from pullout tests, it is possible to calculate from the theoretical solutions thus obtained the maximum soil nail head movement that can be allowed in a performance test so as to compare it with the actual measured values.
机译:在大多数土钉式边坡工程中,通常有两种基本测试类型[BSI。 BS EN 14490:2010。执行特殊的岩土工程-土钉; 2010]:牺牲性指甲测试和生产指甲测试。在香港,《地理指南7》 [GEO。土钉设计和施工指南(Geoguide 7)。香港:土木工程拓展署岩土工程处; [2008年]只有一项抽出测试,这是一项旨在验证设计假设的牺牲测试。另外,建筑服务部(ArchSD)要求所有土钉工程在施工后除了进行拉拔测试外,还要进行性能测试(即生产钉子测试)。在现有的建筑署土钉工程中,性能测试中土钉头移动的验收标准是基于拔出试验中的标准。尽管如此,其理论基础还不太牢固。另一方面,BSI [BS EN 14490:2010。特殊岩土工程的执行-土钉; [2010年]接受标准也无法适用,因为它们的土钉具有剥离区域,未完全粘合。因此,本文的目的是基于弹性理论对性能测试中土钉的荷载变形特性进行理论研究,以建立更合理的验收标准。根据目前的理论分析,结合拉拔试验的载荷变形数据,可以从理论解中计算出这样获得的最大土钉头运动,该最大土钉头运动可以在性能试验中允许,以便将其与实际测量值进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号