...
首页> 外文期刊>VGB PowerTech >Maintenance problems of run-off-river power plants in the change of time
【24h】

Maintenance problems of run-off-river power plants in the change of time

机译:随时间变化的径流电厂维护问题

获取原文
获取原文并翻译 | 示例
           

摘要

The mentioned examples are to illustrate of the full range of problems. Naturally the problems encountered are in line with the change of times. Maintenance engineers of all fields, e.g. civil engineering, hydrology and surveying, as well as electrical and mechanical engineering are to find new solutions and to ensure the substance and reliability of power plants. The life cycle of hydro-power stations can be described with the well-know "bath curve" (Figure 6). The classification into "young plants", "medium-aged plants" and "old plants" gives an idea about future problems for the next generation of maintenance engineers.
机译:所提到的示例旨在说明所有问题。自然,遇到的问题与时代的变化是一致的。所有领域的维护工程师,例如土木工程,水文学和测量以及电气和机械工程将寻找新的解决方案,并确保发电厂的实质性和可靠性。水电站的生命周期可以用众所周知的“浴曲线”来描述(图6)。对“年轻植物”,“中年植物”和“老植物”的分类为下一代维护工程师提供了有关未来问题的想法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号