First Year Operation Experience with a 1 t/h CO{sub}2 Absorption Pilot Plant at Esbjerg Coal-fired Power Plant

机译:埃斯比约燃煤电厂的1 t / h CO {sub} 2吸收式中试装置在第一年的运营经验

获取原文
获取原文并翻译 | 示例
           

摘要

As part of the EU integrated project CASTOR, a 1 t/h CO{sub}2 absorption pilot plant has been erected at the 400 MW coal-fired Esbjerg power plant. The main purpose of the pilot plant is to demonstrate the post-combustion capture technology in conjunction with a coal-fired power plant. In January-February 2006, a 1000 hours test campaign on a conventional solvent, 30%-weight MEA solution, was conducted at the pilot plant. This paper summarises the initial operation experience and some of the first results obtained during the 1000 hours MEA campaign.
机译:作为欧盟综合项目CASTOR的一部分,在400兆瓦的燃煤埃斯比约电厂中建立了一个1 t / h的CO {sub} 2吸收试点工厂。试点工厂的主要目的是与燃煤电厂一起展示燃烧后捕集技术。 2006年1月至2月,在中试工厂进行了1000小时的常规溶剂,30%重量的MEA溶液的测试活动。本文总结了最初的运营经验以及在1000小时MEA活动中获得的一些初步结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号