METHOD FOR THE OPERATION OF A STEAM POWER PLANT WITH A COAL-FIRED STEAM GENERATOR AS WELL AS A STEAM POWER PLANT

机译:用燃煤蒸汽发电机以及蒸汽电厂运行蒸汽电厂的方法

摘要

A process for operating a steam power plant (1) having a coal-fired steam generator (2),in which at least two partial air streams (23, 24) are heated by means of the exchange of heat in at least one exhaust gas/air heat exchanger (7, 25) with hot exhaust gases (21) that are obtained in the steam generator (2) by the combustion of coal (26) the coal is dried in a milling-drying system (3) with a first partial air stream of the heated air supplied as a primary air stream (23) and a second partial air stream of the heated air is supplied to the steam generator as a secondary air stream (24) for the combustion of the coal (26), and in which in an air/air heat exchanger (8) the secondary air stream (24) is preheated upstream from the exhaust gas/air heat exchanger (7, 25) with respect to the direction in which the secondary air stream (24) flows by the exchange of heat with the heated primary air stream (23), and the steam power plant to perform the process.
机译:具有燃煤蒸汽发生器(2)的蒸汽发电厂(1)的运行方法,其中至少两个部分气流(23、24)通过至少一种废气中的热交换而被加热空气/空气热交换器(7、25),其中的热废气(21)是通过蒸汽发生器(2)燃烧煤(26)获得的,而煤则通过研磨干燥进行干燥系统(3),其中,作为主要空气流(23)供应的热空气的第一部分空气流和作为辅助空气流(24)的第二部分空气流被提供给蒸汽发生器煤(26),其中在空气/空气热交换器(8)中,二次空气流(24)相对于废气/空气热交换器(7、25)的上游方向进行了预热二次空气流(24)通过与加热的一次空气流(23)进行热交换而流动,并通过蒸汽发电厂进行处理。

著录项

  • 公开/公告号IN275022B

    专利类型

  • 公开/公告日2016-08-19

    原文格式PDF

  • 申请/专利权人

    申请/专利号IN2635/DEL/2007

  • 发明设计人 KROGMANN UWE;

    申请日2007-12-17

  • 分类号F01K23/00;F01K13/00;

  • 国家 IN

  • 入库时间 2022-08-21 14:24:28