The Stade nuclear power plant, which is located right next to the river Elbe was decommissioned on 14 November 2003. Planning for the post-closure phase and later dismantling of the overall facility began already during regular operation. Chemical cleaning of radioactively contaminated surfaces, i. e. system decontamination, was prepared and carried out as a preliminary measure. The procedural implementation of the system decontamination described here incorporates stipulations for the expedient scope of the facility that is to be included in the system decontamination. As a result of the successfully completed system decontamination, it was possible to reduce substantially the dose-rate in the rooms of the facility.
机译:位于易北河旁的施塔德核电站已于2003年11月14日退役。关闭后阶段的计划以及后来整个设施的拆除工作已在正常运行期间开始。化学清洁放射性污染的表面,即e。作为初步措施,准备并执行了系统消毒。此处描述的系统净化的程序实施包含了要纳入系统净化的便利设施范围的规定。由于成功完成了系统消毒,因此可以大大降低设施室内的剂量率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号