...
首页> 外文期刊>Tube and Pipe Technology >Fusion Chosen for Complex Kin Men Island Submarine Pipeline Installation
【24h】

Fusion Chosen for Complex Kin Men Island Submarine Pipeline Installation

机译:为复杂的金门岛海底管道安装选择Fusion

获取原文
获取原文并翻译 | 示例
           

摘要

AWT Fusion, the Malaysian division of Fusion, the global leader in polyethylene pipe jointing techniques, has been chosen to help install an underwater potable water supply pipeline between the Kin-men Islands located on the Taiwan Straits. The complexity of the project was heightened with the seabed being littered with unexploded mines.Mr C T Toh, the Operations Manager of AWT Fusion, initially made contact with the two consultants responsible for the design of this project, Intec Engineering of Malaysia and King-Tech Engineering Consultants of Taiwan. The consultants, after due consideration and study, provided a specification for the jointing of the polyethylene pipes and this was made available to pipeline contracting companies in the region. The Taiwanese Government funded the project.
机译:全球领先的聚乙烯管材接合技术部门的马来西亚分公司AWT Fusion被选中帮助在台湾海峡的金门群岛之间安装水下饮用水供应管道。 AWT Fusion的运营经理CT Toh先生最初与负责该项目设计的两名顾问,马来西亚Intec Engineering和King-Tech取得了联系,使项目的复杂性变得更加严重,海底布满了未爆炸的地雷。台湾工程顾问。顾问们经过适当的考虑和研究后,提供了聚乙烯管道连接的规范,该规范已提供给该地区的管道承包商。台湾政府资助了该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号