首页> 外文期刊>Transportation Professional >Good planning and cultural change key to delivering BIM
【24h】

Good planning and cultural change key to delivering BIM

机译:良好的规划和文化变革是实现BIM的关键

获取原文
获取原文并翻译 | 示例
       

摘要

Building Information Modelling and the increasing use of digital technology in managing infrastructure assets promise great things. But there are many important issues to consider first says Alexandra Luck. Government's Construction Strategy, published in May 2011, calls for "a profound change in the relationship between public authorities and the construction industry to ensure the Government gets the social and economic infrastructure it needs for the long term". This was further supported by the 'Industrial Strategy Construction 2025', published in July 2013 and is being developed still further by 'Digital Built Britain', the strategic plan for Level 3 Building Information Modelling (BIM). Digitally built assets and environments will need to deliver future fiscal, functional, sustainability and growth objectives. As a result they will impact on procurement, delivery and operational processes.
机译:建筑信息模型和数字技术在管理基础设施资产方面的日益广泛的使用有望带来巨大的成就。但是亚历山德拉·勒克(Alexandra Luck)说,首先要考虑许多重要问题。政府于2011年5月发布的《建设战略》呼吁“彻底改变公共机构与建筑业之间的关系,以确保政府获得长期所需的社会和经济基础设施”。 2013年7月发布的“ 2025年工业战略建设”进一步支持了这一点,并且“数字建筑英国”(Level 3 Building Information Modeling(BIM)的战略计划)正在进一步开发。数字化资产和环境将需要实现未来的财政,功能,可持续性和增长目标。结果,它们将影响采购,交付和运营流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号