首页> 外文期刊>Chemical Processing >Consider a Cold Eye Review
【24h】

Consider a Cold Eye Review

机译:考虑冷眼评论

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

ALMOST ALL best-in-class plant owners and contractors now rely on a phase-gated project delivery-process (PDP), as depicted in Figure 1, to maximize the benefits of capital spending. They make "goo go/recycle" decisions at stage gates, especially the ones at the end of each of the first three phases, the front-end loading ones (PEL 1-3). These gates also often are linked to funding decisions, either partial funding to support the next planning/development phase or full funding, usually at the completion of front-end engineering, to authorize the execution phase of the project.
机译:如图1所示,几乎所有一流的工厂所有者和承包商现在都依赖阶段控制的项目交付流程(PDP),以最大程度地利用资本支出的收益。他们在登机口做出“通过/不通过/回收”的决定,尤其是在前三个阶段的末尾,即前端装载阶段(PEL 1-3)。这些门通常也与资金决策相关,或者是部分资金来支持下一个计划/开发阶段,或者是全部资金(通常在前端工程完成时)以授权项目的执行阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号