【24h】

Permanent Solution for Emergency Restoration

机译:紧急恢复永久解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

Dominion now stocks replacement transmission structures to enable its "do it once and walk away" strategy. Imagine standing in a swamp with knee-deep mud, rain pouring down and mosquitoes swarming on a hot muggy day in July. You are watching a 500-kV tower - destroyed by a tornado the night before - being hauled away so a temporary structure can be placed into the line and power can be restored. Now imagine it is three months later, the swamp still has knee-deep mud, mosquitoes are still swarming, and it is a bright and sunny humid day. The temporary structure installed in the 500-kV line is being dissembled and replaced with a permanent structure. Deja vu?
机译:现在,Dominion备有替换传输结构,以实现其“一次做就走”的策略。想象一下,在七月的炎热闷热日里,站在膝盖深的泥泞沼泽中,倾盆大雨倾泻而下,蚊子蜂拥而至。您正在观看一座500 kV的塔楼-前一天晚上被龙卷风摧毁了-被拖走,以便可以在线路中放置临时结构并恢复电源。现在想象一下,三个月后,沼泽仍然有膝盖深的泥泞,蚊子仍在蜂拥而至,这是晴天,晴天潮湿。正在拆除安装在500 kV线路中的临时结构,并用永久结构代替。 Deja vu?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号