Wake Electric follows WiMAX installation with feeder automation featuring FLISR capabilities. The distribution grid is quickly evolving into a realtime system that dynamically changes instantaneously. As connected loads continuously vary, component failures necessitate changes in the interconnected system of feeders and substations. These system changes typically happen extremely fast, such as when a failed piece of equipment is isolated by the protection systems. When these high-speed dynamic changes take place, a true smart grid control system must react in symphony with these changes to provide consumers with alternative power sources.
展开▼