It's Time to Get in STEP

机译:是时候进入STEP了

获取原文
获取原文并翻译 | 示例
       

摘要

Now is the time for all electric utilities to get involved with the Spare Transformer Equipment Program (STEP). STEP continues to grow and represent the best of what the electric power industry can accomplish by working together for a common cause. STEP was conceived following the 9/11 terrorist attacks and formally launched in 2006 to address the specific threat of attacks on utility substations. Given the long lead times in manufacturing substation transformers - typically about two years - along with the reality that most transformers are manufactured offshore, STEP created an innovative sharing arrangement among electric utilities to make efficient use of the industry's existing spare transformers. Today, STEP comprises 49 transmission providers whose service territories cover approximately 70% of the U.S. transmission grid.
机译:现在是所有电力公司参与备用变压器设备计划(STEP)的时候了。 STEP不断发展壮大,代表着为共同的事业而共同努力所能取得的最好成就。 STEP是在9/11恐怖袭击之后构思的,并于2006年正式启动,以应对公用事业变电站遭受袭击的特定威胁。鉴于制造变电站变压器的交货时间较长(通常约为两年),而且大多数变压器都是在海上制造的,因此STEP在电力公司之间创建了一种创新的共享安排,以有效利用行业现有的备用变压器。如今,STEP包括49个传输提供商,其服务范围覆盖了美国传输网约70%的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号