When you change from one tube gauge to another, whether you adjust the fin passes depends on your background. A tube mill operator probably will answer yes; an engineer probably will answer no. Whether you're a tube mill operator or an engineer, the question can be answered correctly only after you consider the relevant parameters carefully. As a typical example, consider an M2 mill that makes tube with a 1.500-inch outside diameter (OD). The wall thickness range is 0.025 to 0.094 in., and the tube is welded 0.030 in. oversize. This established reduction in the sizing mill is 2.0 percent in three passes. If divided equally, this is 0.671 percent per pass, or a multiplier per pass of 0.9934. The same reduction per pass at the neutral axis is used to design the fin passes, although some may consider this excessive.
机译:从一个管规转换为另一个管规时,是否调整散热片通过量取决于您的背景。管厂操作员可能会回答“是”。工程师可能会回答“否”。无论您是管厂操作员还是工程师,只有仔细考虑了相关参数后,才能正确回答该问题。作为一个典型的例子,考虑一个M2轧机,该轧机生产的管子的外径(OD)为1.500英寸。壁厚范围为0.025到0.094英寸,管子的焊接尺寸为0.030英寸。分三步将确定的上浆厂减少了2.0%。如果平均分配,则为每通0.671%,或每通0.9934的乘数。在中性轴处,每次通过的减少量相同,用于设计翅片通过,尽管有些人可能认为这样过大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号