首页> 外文期刊>The Mining Record >Hecla/Great Basin Gold Modify Hollister Earn-in Agreement
【24h】

Hecla/Great Basin Gold Modify Hollister Earn-in Agreement

机译:赫克拉/大盆地金矿修改霍利斯特赚钱协议

获取原文
获取原文并翻译 | 示例
           

摘要

COEUR D'ALENE, ID -Hecla Mining Company and Great Basin Gold Ltd.have modified the 2002 Earn-in Agreement to the Hollister Development Block (HDB) gold exploration project in Nevada and consequently the parties have agreed to dismiss all litigation immediately. Hecla Mining Company President and Chief Executive Officer Phillips S. Baker, Jr., said, "Great Basin Gold and Hecla have modified the Earn-in Agreement to reflect changing conditions at the Project, and markets in general, primarily by revising certain deadlines or milestones in the original Earn-in Agreement and funding commitments by Hecla. We're more optimistic than ever that this Project can be very successful and profitable for both of us. The underground exploration drift has intersected the vein structures, underground drilling platforms have been constructed and the drill rigs are now turning. The drill holes will be short, closely spaced holes, less than 700 feet in length, aimed at upgrading the resource previously identified by Great Basin Gold and converting it to reserve."
机译:爱荷华州科伊尔-达莱内-赫克拉矿业公司和Great Basin Gold Ltd.已修改了内华达州Hollister开发区(HDB)黄金勘探项目的2002年“收入协议”,因此,双方同意立即撤消所有诉讼。 Hecla矿业公司总裁兼首席执行官Phillips S. Baker,Jr.表示:“ Great Basin Gold和Hecla修改了“收益协议”,以反映该项目以及整个市场的变化情况,主要是通过修改某些截止日期或最初的收入协议和Hecla的资金承诺具有里程碑意义,我们比以往任何时候都更加乐观,因为这个项目对我们俩都是非常成功和有利可图的;地下勘探漂移与静脉结构相交,地下钻井平台钻孔将是短的,近距离的孔,长度小于700英尺,目的是升级以前由大盆地黄金公司(Great Basin Gold)确定的资源并将其转换为储备。”

著录项

  • 来源
    《The Mining Record》 |2006年第3期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号