...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >A heuristic approach based on time-indexed modelling for scheduling and tool loading in flexible manufacturing systems
【24h】

A heuristic approach based on time-indexed modelling for scheduling and tool loading in flexible manufacturing systems

机译:基于时间索引建模的启发式方法用于柔性制造系统中的计划和工具加载

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this paper, we simultaneously consider the scheduling and tool loading problems in flexible manufacturing systems. There are various jobs that must be processed on a number of parallel computer numerical control machines. The processing of each job requires a set of machine tools. However, the number of tool copies available in the system is limited due to economic restrictions. The problem, therefore, is to schedule the jobs and the required tools in such a way that the makespan is minimized. We present a time-indexed mathematical model of the problem. A heuristic approach based on the mathematical model is also developed and the computational results are presented. The goal of this study is to develop a new approach for simultaneously scheduling the jobs and loading the tools in flexible manufacturing systems and benefit from the advantages of time-indexed modelling.
机译:在本文中,我们同时考虑了柔性制造系统中的调度和工具装载问题。在许多并行计算机数控机器上必须处理各种作业。每个作业的处理都需要一套机床。但是,由于经济限制,系统中可用的工具副本数量受到限制。因此,问题在于以使制造期最小化的方式安排作业和所需的工具。我们提出问题的时间索引数学模型。还开发了一种基于数学模型的启发式方法,并给出了计算结果。这项研究的目的是开发一种新的方法,用于同时调度作业和在柔性制造系统中加载工具,并从时间索引建模的优点中受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号