首页> 外文期刊>The Asia Miner >Drilling boosts Jiama resources 443%
【24h】

Drilling boosts Jiama resources 443%

机译:钻探可提高嘉马资源443%

获取原文
获取原文并翻译 | 示例
           

摘要

INFILL and step-out drilling at China Gold International Resources Corp's Jiama Copper-Gold and Polymetallic Project in Tibet Autonomous Region has expanded the overall resource and increased the measured and indicated resources by 443%. These results have prompted the company to proceed with planning to support a major mine expansion. The drilling program resulted in the upgrading of a significant amount of the inferred resources to measured and indicated status. The total measured and indicated resource has increased from 185.1 million tonnes averaging 0.74% copper and containing 1.38 million tonnes of copper, to 1.006 billion tonnes averaging 0.41% copper containing 4.08 million tonnes of copper.
机译:中国黄金国际资源公司位于西藏自治区的甲玛铜金多金属项目的INFILL和渐进钻探已扩大了整体资源,并将实测和指示资源增加了443%。这些结果促使该公司继续进行计划以支持大型矿山扩建。钻探计划导致将大量推断资源升级为已测量和指示的状态。测算和标明的资源总量已从1.851亿吨(平均铜含量为0.74%,含138万吨)增加到10.06亿吨,平均铜含量为0.41%,其中包含408万吨铜。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号