...
首页> 外文期刊>TEX Energy Report >Taiwan's FPCC Restarts Operations Of No.2 Naphtha Cracker-Expected to take a few days before it normally goes on stream
【24h】

Taiwan's FPCC Restarts Operations Of No.2 Naphtha Cracker-Expected to take a few days before it normally goes on stream

机译:台湾FPCC重启第二个石脑油裂解装置的运营-预计需要几天才能正常生产

获取原文
获取原文并翻译 | 示例
           

摘要

Formosa Petrochemical Corporation, or FPCC, in Taiwan restarted operations of No.2 naphtha cracker, capable of producing 1,035,000 MT per year, on November 18th, which had been inspected since the beginning of last month. FPCC plans to enhance the operating rate up to 100% of capacity. The company runs three naphtha crackers simultaneously for the first time in four and a half months since a fire accident occurred in early July.
机译:台湾的台塑石化公司(FPCC)于11月18日重启了第二座石脑油裂解装置的生产,该装置年产能为1,035,000吨,该装置自上个月初以来已经接受了检查。 FPCC计划将开工率提高至最大产能的100%。自7月初发生火灾以来,该公司在四个半月内首次同时运行三个石脑油裂解装置。

著录项

  • 来源
    《TEX Energy Report》 |2010年第22期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号