首页> 外文期刊>Platform Oil & Gas Technology Review >Jubilant Energy NX Successful Testing and Production of Seventh Development Well of Phase III Drilling Campaign in the Oil Producing Kharsang Field
【24h】

Jubilant Energy NX Successful Testing and Production of Seventh Development Well of Phase III Drilling Campaign in the Oil Producing Kharsang Field

机译:Jubilant Energy NX在哈桑油田生产中成功进行了第三阶段钻探活动的第七口开发井的测试和生产

获取原文
获取原文并翻译 | 示例
       

摘要

Jubilant recently announced that KSG#64 (KPL-B), the last well of the seven well Phase III development drilling campaign in the oil producing Kharsang Field, Arunachal Pradesh, has been successfully tested for oil and has been put on production at an initial gross rate of 226 barrels of oil per day.
机译:欢腾公司最近宣布,KSG#64(KPL-B)是阿鲁纳恰尔邦石油生产的Kharsang油田七口井三期开发钻探活动的最后一口井,已成功进行了石油测试,并已初步投入生产每天的石油总产量为226桶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号