...
首页> 外文期刊>platts Inside FERC's Gas Market Report >Final leg of REX-West begins service, but some still warn of bottlenecks
【24h】

Final leg of REX-West begins service, but some still warn of bottlenecks

机译:REX-West的最后一站开始服役,但仍有人警告瓶颈

获取原文
获取原文并翻译 | 示例
           

摘要

Rockies Express Pipeline last week placed the final 210 miles of the Rockies Express West pipeline into service, allowing roughly 1.5 Bcf/d of once-stranded Rockies gas to flow to major interstate pipeline interconnects in the upper Midwest. However, some officials again warned that the Rockies Express might not be enough to stem another infrastructure bottleneck as supplies out of the region continue to ramp up aggressively.
机译:上周,落基山脉特快管道使落基山脉特快西管道的最后210英里投入使用,这使得大约1.5 Bcf / d的一次搁浅的落基山脉天然气流向中西部上部的主要州际管道互连。但是,一些官员再次警告说,落基山脉快车可能不足以阻止另一个基础设施瓶颈,因为该地区以外的物资继续激增。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号