Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

机译:确定水利建设项目成本超支和时间延迟的影响因素

获取原文
           

摘要

Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW) method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.
机译:伊朗的水利建设项目经常面临导致成本超支和时间延迟的问题,这是一般建设项目中最常见的两个问题。这项调查的目的是识别和量化这些问题,从而有助于避免这些问题。这项调查代表了文献中发现的最重要问题的集合,根据其来源将其分为11组。所使用的调查表包含84个问题,这些问题由从事水利建设项目的随机工程师回答。相对重要性权重(RIW)方法用于加权84个问题中每个问题的重要性。本次调查的重点是前十大问题:招标方式中的官僚主义,通货膨胀,政府的经济状况,设计前收集的信息不足和未完成调查,每月付款困难,材料成本变化,政府修改法律,财务困难,融资方式和已完成工作的付款方式以及业主进行的更改。每个问题的一节均提供了有关这些问题的其他信息。在该调查的全文中,使用相同的加权方法对主要群体进行分类,结果表明,与政府,所有者和顾问等群体有关的问题影响最大。该调查的最后一部分描述了参与该调查的工程师的观点以及他们提出的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号