首页> 外文期刊>ZEVrail - Glasers Annalen >PROJEKT INSTANDHALTUNG DURCH ZENTRAL GESTEUERTE INTEGRIERTE PROZESSE (PRINZIP):DAS UMFASSENDE DV-SYSTEM ZUR UNTERSTUTZUNG DER INSTANDHALTUNG DES FAHRWEGS BEI DER DEUTSCHEN BAHN
【24h】

PROJEKT INSTANDHALTUNG DURCH ZENTRAL GESTEUERTE INTEGRIERTE PROZESSE (PRINZIP):DAS UMFASSENDE DV-SYSTEM ZUR UNTERSTUTZUNG DER INSTANDHALTUNG DES FAHRWEGS BEI DER DEUTSCHEN BAHN

机译:通过集中控制的集成过程进行项目维护(原理):支持德国铁路路线维护的综合IT系统

获取原文
获取原文并翻译 | 示例
           

摘要

The paper describes the problems and the solution selected to implement a process control and information managements system for the maintenance of DB Netz(Deutsche Bahn Group) track installations. A few typical event signals are discussed to outline the functioning of the system. Key functions have been assigned to the management centres for process control and fault clearing. In conclusion, the current status of project implementation and the future actions are described.
机译:本文描述了为实施DB Netz(德国铁路集团)轨道安装维护过程控制和信息管理系统而选择的问题和解决方案。讨论了一些典型的事件信号,以概述系统的功能。已将关键功能分配给管理中心以进行过程控制和故障清除。总之,描述了项目实施的现状和未来的行动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号