...
首页> 外文期刊>Windpower monthly >COMBINING WAVE ENERGY AND FLOATING WIND UK LAUNCHES TEST SITE IN WALES
【24h】

COMBINING WAVE ENERGY AND FLOATING WIND UK LAUNCHES TEST SITE IN WALES

机译:结合波能量和浮动风英国在威尔士推出试验场

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the UK, which formally left the EU on 31 January 2020 and severed all remaining ties as of 1 January 2021, more than 10GW of offshore wind is already in operation and the development pipeline exceeds 50GW. Speaking at WindEnergy Hamburg 2020, the head of offshore at the Department for Business, Energy and Industrial Strategy (BEIS), Yuen Cheung, said developers in the UK are already coming up against cumulative impact issues around birds, noise and radar, even without factoring in future new uses of the sea. In conjunction with seabed landlord the Crown Estate, BEIS has set up an offshore-wind evidence and change programme to bring stakeholders together -from NGOs to developers and statutory conservation bodies -to examine barriers in the marine environment and identify more strategic approaches.
机译:在英国,在2020年1月31日正式离开欧盟并截至2021年1月1日的所有剩余关系,超过10GW的海上风已经运作,开发管线超过50GW。在Mindhore汉堡汉堡汉堡(Beis)的近海部汉堡(Beis),即使没有考虑,英国的开发人员也已经反对跨越鸟类,噪音和雷达的累积影响问题在未来的海上用途。与海底房东联合皇家房地产,Beis已成立了海上风证据和改变计划,以使利益相关者共同 - 从非政府组织到开发商和法定保护机构 - 审查海洋环境的障碍,并确定更多的战略方法。

著录项

  • 来源
    《Windpower monthly》 |2021年第1期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号