首页> 外文期刊>WET News >Crossness to get new pumps
【24h】

Crossness to get new pumps

机译:交叉获得新的泵

获取原文
获取原文并翻译 | 示例
       

摘要

Bedford pumps is implementing its latest multi-million-pound contract to manufacture, test, install and commission 13 pumps for the refurbishment of the Intake Pumping Station at Thames • Water's Crossness Sewage Treatment Works.rnThames Water is currently investing £220M to upgrade the works, which will enable the site to treat 44% more sewage than its current capability, and part of the upgrade was to construct a new intake pumping station to cater for the increased capacity. During the tendering period, Im-tech Process worked closely with Bedford Pumps to pro-rnvide a bespoke solution that involved utilising the existing intake pumping station,rnthereby making substantial savings in the capital costs of the project.
机译:贝德福德泵业公司正在执行其最新的数百万英镑的合同,以制造,测试,安装和调试13台泵,用于翻新泰晤士河的进水泵站。•沃特世的交叉污水处理厂。rn泰晤士水务公司目前正在投资2.2亿英镑以对其进行升级,这将使该厂处理的污水量比其目前的处理能力高出44%,而升级的一部分是建造一个新的进水泵站,以满足增加的处理能力。在招标期间,Im-tech Process与Bedford Pumps密切合作,提供了定制解决方案,其中涉及利用现有的进气泵站,从而节省了项目的资本成本。

著录项

  • 来源
    《WET News》 |2012年第7期|p.a1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:20:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号