...
首页> 外文期刊>WET News >Kobus pulls the cables
【24h】

Kobus pulls the cables

机译:Kobus拉电缆

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

U mole recently provided two products from its hire range to help on a challenging dual-carriageway for client Manterfield Drilling that required the replacement of a 25mm diameter PE gas main with a new 90mm diameter PE supply. The scheme is part of upgrading works at Yorkshire Water's Sandall SewageTreatment Works. The two systems were a Kobus Cable Puller and a PB30 cable-based pipe-bursting system. The existing gas main ran beneath a section of the A630 Wheatley Hall Road dual-carriageway near Doncaster. As well as upsizing the existing 25mm diameter PE supply to 90mm diameter PE, the new supply main had to be tee'd off a nearby existing 16" diameter gas main. The dual carriageway crossing length was some 18m.
机译:U mole最近提供了其租用范围内的两种产品,以帮助客户Manterfield Drilling进行具有挑战性的双通道运输,该管道需要用新的90mm直径PE气源替换直径25mm的PE气体总管。该计划是约克郡供水公司的桑德尔污水处理厂升级工程的一部分。这两个系统是Kobus电缆拔轮器和PB30电缆爆破系统。现有的天然气总管在唐卡斯特附近的惠特利霍尔公路A630双车道的一部分下方行驶。除了将现有的25mm直径的PE供应扩大到90mm直径的PE外,还必须从附近的现有16“直径的天然气总管上装满新的供应总管。双车道交叉长度约为18m。

著录项

  • 来源
    《WET News》 |2013年第8期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号