...
首页> 外文期刊>Water >THE NATIONAL WATER COMMISSION'S MURRAY-DARLING BASIN PLAN AUDIT ROLE
【24h】

THE NATIONAL WATER COMMISSION'S MURRAY-DARLING BASIN PLAN AUDIT ROLE

机译:全国水委员会默里·达林盆地计划审核角色

获取原文
获取原文并翻译 | 示例
           

摘要

When it comes to Australian water reform, the making of the Murray-Darling Basin Plan has been the dominant issue in both the public and policy arenas over the past few years. The National Water Commission sees the Basin Plan as a step-change in the governance and management of water resources in Australia's largest and most important river system. The Basin Plan aims to deliver on the vision articulated in the National Water Initiative (NWI) by restoring the Basin's rivers and groundwater resources to health and supporting strong communities and resilient industries.
机译:谈到澳大利亚的水改革,在过去几年中,墨累-达令盆地计划的制定一直是公共和政策领域的主要问题。国家水务委员会将流域计划视为澳大利亚最大和最重要的河流系统中水资源治理和管理的一步变化。 《流域计划》旨在通过恢复流域的河流和地下水健康,并支持强大的社区和有韧性的产业,来实现国家水资源计划(NWI)所表达的愿景。

著录项

  • 来源
    《Water》 |2013年第3期|33-34|共2页
  • 作者

    Karlene Maywald;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号