...
首页> 外文期刊>Water SA >Piloting a method to evaluate the implementation of integrated water resource management in the Inkomati River Basin
【24h】

Piloting a method to evaluate the implementation of integrated water resource management in the Inkomati River Basin

机译:评估因科马蒂河流域水资源综合管理实施情况的方法

获取原文
获取原文并翻译 | 示例

摘要

This paper provides an assessment of the implementation of principles of integrated water resource management (IWRM) in the Inkomati River Basin (IRB), shared by South Africa, Swaziland and Mozambique. A methodology with a set of principles, change areas and measures was developed as a performance assessment tool. The tool was piloted in the IRB and results from the application were used to refine and finalise the tool. Piloting of the tool did provide very useful insights into IWRM implementation in the IRB and highlighted gaps where future attention needs to focus. Good progress has been realised with respect to creating the enabling environment and institutional frameworks as the key principles of IWRM have been successfully articulated in policy and legislation and a relatively satisfactory degree of stakeholder participation achieved. Measures related to the IWRM implementation instruments seem to be the least developed, particularly the financial enabling environment and institutional capacity building change areas. More attention also needs to be paid to conflict resolution mechanisms. The results from the pilot also showed that countries should consider a phased approach to assessment of IWRM, as implementation does seem to follow a process of creating the enabling environment, followed by formulating and implementing the institutional framework and creation and application of IWRM management instruments.
机译:本文对南非,斯威士兰和莫桑比克共有的因科马蒂河流域(IRB)中水资源综合管理(IWRM)原则的实施情况进行了评估。具有一套原则,变更领域和措施的方法论被开发为绩效评估工具。该工具已在IRB中进行了试行,应用程序的结果用于完善和确定该工具。对该工具的试用确实提供了对IRB中IWRM实施的非常有用的见解,并突出了需要关注的空白。在建立有利的环境和体制框架方面已经取得了良好的进展,因为在政策和立法中成功地阐明了水资源综合管理的关键原则,并且利益相关者的参与程度达到了相对令人满意的水平。与水资源综合管理实施工具有关的措施似乎是最不发达的,特别是在财务扶持环境和机构能力建设变化领域。还需要更加注意解决冲突的机制。试点结果还表明,各国应考虑采用一种分阶段的方法来评估水资源综合管理,因为实施似乎确实是在创造有利环境的过程之后,随后制定并实施了体制框架以及水资源综合管理管理手段的创建和应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号