首页> 外文期刊>Water resources research >Intermittent Channel Systems of a Low-Relief, Low-Gradient Floodplain: Comparison of Automatic Extraction Methods
【24h】

Intermittent Channel Systems of a Low-Relief, Low-Gradient Floodplain: Comparison of Automatic Extraction Methods

机译:低浮雕,低梯度泛洪叶的间歇通道系统:自动提取方法的比较

获取原文
获取原文并翻译 | 示例
           

摘要

Intermittent floodplain channels are low-relief conduits etched into the floodplain surface and remain dry much of the year. These channels comprise expansive systems and are important because during low-level inundation they facilitate lateral hydraulic connectivity throughout the floodplain. Nevertheless, few studies have focused on these floodplain channels due to uncertainty in how to identify and characterize these systems in digital elevation models (DEMs). In particular, their automatic extraction from widely available DEMs is challenging due to the characteristically low-relief and low-gradient topography of floodplains. We applied three channel extraction approaches to the Congaree River floodplain DEM and compared the results to a channel reference map created through numerous field excursions over the past 30 years. The methods that we tested are based on flow accumulation area, topographic curvature, and mathematical morphology, or the D8, Laplacian, and bottom-hat transform (BHT), respectively. Of the 198 km of reference channels the BHT, Laplacian, and D8 extracted 83%, 71%, and 23%, respectively, and the BHT consistently had the highest agreement with the reference network at the local (5 m) and regional (10 km) scales. The extraction results also include commission "error", augmenting the reference map with about 100 km of channel length. Overall, the BHT method provided the best results for channel extraction, giving over 298 km in 69 km(2)with a detrended regional relief of 1.9 m. Further, these analyses allow us to shed light on the meaning and use of the term "low-relief landscapes".
机译:间歇性洪泛平原渠道是蚀刻到洪泛区的低浮雕导管,并留在一年中的大部分时间。这些通道包括膨胀系统,并且很重要,因为在低级别的淹没期间,它们促进了整个洪泛区的横向液压连接。尽管如此,由于如何在数字高度模型(DEM)中,少数研究由于如何在数字高度模型(DEM)中的不确定性,这些洪泛平原渠道都集中在这些洪泛平面渠道上。特别地,其从广泛可得的DEM自动提取是具有挑战性由于特征性的低浮雕和洪泛区的低梯度形貌。我们将三种渠道提取方法应用于Congaree河洪泛区DEM,并将结果与​​过去30年来通过众多现场游览创建的渠道参考图。我们测试的方法基于流量累积区域,地形曲率和数学形态,或D8,拉普拉斯和底帽变换(BHT)。在198公里的参考渠道中,BHT,拉普拉斯和D8分别提取了83%,71%和23%,而BHT始终如一地与当地(5米)和区域的参考网络一致(10 km)鳞片。提取结果还包括佣金“错误”,增强了约100公里的通道长度的参考图。总的来说,BHT方法为渠道提取提供了最佳效果,在69公里(2)中提供298公里(2),具有1.9米的区域缓解。此外,这些分析允许我们阐明术语“低浮雕景观”术语的含义和使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号