首页> 外文期刊>Water environment & technology >Pipe and site constraints work against plan A
【24h】

Pipe and site constraints work against plan A

机译:管道和工地约束与计划A相抵触

获取原文
获取原文并翻译 | 示例
           

摘要

Concern about the inferior Class Ⅳ wires that were used in the City of Baltimore's prestressed concrete cylinder pipeline in the Southwest Diversion led the engineering staff to call f°r support. A combination of risk-assessment and closed-circuit television studies confirmed that 2.7 km (1.7 mi) of the gravity sections were at risk for failure due to interior corrosion.
机译:由于担心巴尔的摩市西南分流处的巴尔的摩市预应力混凝土圆筒管道中使用的劣等Ⅳ级电线,导致工程人员呼吁给予支持。风险评估和闭路电视研究相结合,证实了2.7公里(1.7英里)的重力段由于内部腐蚀而存在失效的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号