...
首页> 外文期刊>Water environment & technology >Nutrient removal remedies: Troubleshooting BNR processes requires a holistic review
【24h】

Nutrient removal remedies: Troubleshooting BNR processes requires a holistic review

机译:营养去除措施:对BNR流程进行故障排除需要全面审查

获取原文
获取原文并翻译 | 示例

摘要

Most water resource recovery facilities (WRRFs) using biological nutrient removal (BNR) processes are required by permit to reduce significantly the total nitrogen (TN) and total phosphorus (TP) concentrations discharged in reclaimed water. In addition, some WRRFs need to meet short-term limits, including daily and weekly maximum concentrations. Meeting these short-term limits requires a higher level of consistency.
机译:许可证要求大多数使用生物营养去除(BNR)工艺的水资源回收设施(WRRF)显着降低再生水排放的总氮(TN)和总磷(TP)浓度。此外,某些WRRF需要满足短期限制,包括每日和每周的最大浓度。满足这些短期限制要求更高的一致性。

著录项

  • 来源
    《Water environment & technology》 |2015年第4期|42-47|共6页
  • 作者单位

    Winter Park, Fla., office of Carollo Engineers Inc. (Walnut Creek Calif.);

    Broomfield, Colo., office;

    Winter Park, Fla., office of Carollo Engineers Inc. (Walnut Creek Calif.);

    Costa Mesa, Calif., office of Carollo Engineers;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号