Your contractor defaulted, now what?

机译:您的承包商违约了,现在怎么办?

获取原文
获取原文并翻译 | 示例
           

摘要

When Rushville, Ind., issued a notice to proceed with its selected contractor to build improvements at its water resource recovery facility (WRRF) on March 31, 2014, it expected all work to be completed by May 29, 2015. The project, authorized as part of the facility's 2013 combined sewer overflow long-term control plan (LTCP), included a new headworks to provide fine screening for solids and floatables control of all influent wastewater, an excess wet weather flow pump station, replacement of the existing aeration blowers, installation of an automated dissolved oxygen control system for energy reduction, and an upgrade of the existing deteriorated electrical system.
机译:2014年3月31日,印第安纳州拉什维尔(Rushville)发出通知,与其选定的承包商继续进行水资源回收设施(WRRF)的改建工程时,它预期所有工作将于2015年5月29日完成。该项目已获授权作为该工厂2013年污水处理厂溢流综合长期控制计划(LTCP)的一部分,其中包括一项新的工程计划,以对所有进水废水的固体和漂浮物进行精细筛分,超额潮湿天气流量泵站,更换现有的曝气鼓风机,安装自动溶解氧控制系统以降低能耗,以及升级现有已损坏的电气系统。

著录项

  • 来源
    《Water environment & technology》 |2017年第2期|32-37|共6页
  • 作者

    Steven P. Gress;

  • 作者单位

    Donohue & Associates Inc. (Sheboygan, Wis.);

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号