首页> 外文期刊>Ux Weekly >Ostrovets 1 reaches minimum controlled power level; government confirms completion delays
【24h】

Ostrovets 1 reaches minimum controlled power level; government confirms completion delays

机译:Ostrovets 1达到最小控制功率水平;政府确认完成延误

获取原文
获取原文并翻译 | 示例
           

摘要

On October 11, Rosatom reported that Unit 1 of the Ostrovets nuclear power plant in Belarus officially entered the self-sustaining controlled nuclear reaction to bring the unit into the minimum controlled power level. Initial criticality of the VVER-1200 allows Rosatom technicians to safely carry out several measurements and monitor the physical characteristics of the reactor core. Over 50 studies will be carried out in the coming weeks to clarify the neutron-physical characteristics of the initial core fuel load.
机译:10月11日,Rosatom报告说,白俄罗斯核电站核电站的第1单元正式进入自持控制的核反应,使该单位成为最低控制权力水平。 VVER-1200的初始临界性允许ROSATOM技术人员安全地进行多次测量并监测反应器核心的物理特性。在未来几周内将在未来几周内进行50多项研究,以澄清初始核心燃料载荷的中子特性。

著录项

  • 来源
    《Ux Weekly》 |2020年第41期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号