【24h】

KBR exit a major move

机译:KBR退出一个重大举措

获取原文
获取原文并翻译 | 示例
       

摘要

KBR'S decision to exit the lump sum engineering, procurement and construction business is hard to believe, given it has dominated the sector for so long. Its name had become synonymous with mega projects and giant surface production facilities, building anything from large platforms to floaters. The booming liquefied natural gas sector in the past decade or so was good to KBR. A multitude of LNG trains were fabricated all around the world in stick-build or modular fashion, whatever was required. In confirming its exit from the lump sum EPC business, KBR emphasised that this included LNG - an interesting point to highlight. The Ichthys project in Australia - in which KBR built the massive onshore LNG facilities in a consortium with JGC and Chiyoda - ran several billion dollars over budget because of difficulties with subcontractors and the client.
机译:KBR的决定退出一次性和工程,采购和施工业务很难相信,鉴于它已经占据了这一部门这么久。它的名字已成为Mega项目和巨大的表面生产设施的代名词,从大型平台到漂浮物的任何东西都有代名词。过去十年中,液化液化天然气部门甚至很好。无论是需要的,都是在世界各地的全球各地制造了众多液化液训练。在确认其退出速率EPC业务时,KBR强调这包括LNG - 一个有趣的亮点。澳大利亚的ICHTHYS项目 - 其中KBR建立了大量的陆上LNG设施,其中包括JGC和Chiyoda - 由于分包商和客户的困难,预算超过了数十亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号