BP is pushing ahead with a new two-well tie-back project to its Andrew platform in the UK North Sea and has awarded Aberdeen-based Rever Offshore a subsea front-end engineering and design contract. The project is aiming to exploit a Lower Cretaceous section of the Andrew Area located in blocks 16/28 and 16/27a-F1, some 750 metres from the Andrew platform.
展开▼