首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Jubilee back at full flow after gas processing trouble
【24h】

Jubilee back at full flow after gas processing trouble

机译:气体处理出现问题后,禧年恢复全流量

获取原文
获取原文并翻译 | 示例
           

摘要

TULLOW Oil has rectified a gas processing problem at its Jubilee field off Ghana that led to oil output being curtailed for about three weeks around the turn of the year, writes Eoin O'Cinneide. The operator of the Kwame Nkrumah floating production, storage and offloading unit said gross oil output from Jubilee last year averaged 78,000 barrels per day, which was below a forecast of 81,200 bpd given in November.
机译:Eoin O'Cinneide写道,塔洛石油公司(TULLOW Oil)已纠正了其在加纳(Ghana)附近的银禧(Jubilee)油田的天然气加工问题,该问题导致石油产量在今年年初减少了大约三周。夸梅·恩克鲁玛(Kwame Nkrumah)浮动生产,存储和卸载部门的运营商表示,去年禧年的石油总产量平均为每天78,000桶,低于11月份给出的81,200桶/天的预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号